Nashville Precision Concrete builds concrete parking lots, drive aisles, entrances and fire lanes for retail centers, offices, churches, apartments and industrial sites around Nashville. Our first step on a lot is studying the grading and drainage plan with the civil engineer, because how rain leaves the pavement shapes everything from slab thickness to joint layout.
Nashville averages about 50 inches of precipitation a year, and large paved areas push all of that water toward inlets, ponds and creeks. Metro Water Services reviews stormwater on new development, and the record 7.25 inches that fell in a single day during the May 2010 flood is a reminder of why. Lots here also face plows and deicing salt in winter and heavy delivery trucks year-round.
We pave commercial lots in Antioch, Hermitage, Madison, Hendersonville, Murfreesboro, Smyrna, La Vergne, Brentwood and Spring Hill, plus sites across the region & more.

We start with the civil drawings, staking and a subgrade check, then build the stone base and pour in a sequence that matches the joint plan. Heavy-duty sections go where trash trucks and deliveries travel, and standard sections handle car parking.
Concrete costs more upfront than asphalt, but it holds up to Nashville summer heat without rutting and needs less resurfacing over the life of the lot.

Accessible stalls, aisles and curb ramps have tight slope limits, so we check grades with a digital level before and after the pour. Detectable warning surfaces are set where ramps meet vehicle areas.
Accessible routes from the stalls to the building entrance are checked as one continuous path, since a single steep transition can fail an inspection.

Entrances that connect to a Metro street are built in the public right-of-way. Permits are requested through the Nashville Department of Transportation's ePermits system at least two business days before work starts, and traffic control is planned with the permit.

Fire lanes and loading routes carry the heaviest loads on the site. We thicken these sections, add load-transfer dowels at joints and confirm turning radii with the plan so trucks are not cutting across curbs.
Dumpster enclosures at the end of these routes take the hardest hits on the site, so we tie their pads into the truck route design.

Concrete valley gutters and inlet aprons carry water to the stormwater system without eroding the edges of the pavement. We form them to the engineer's elevations so water does not pond in stalls or at doorways.
Ponding water in a Nashville lot freezes into slick patches on winter mornings, which is one more reason we set elevations carefully.

Broken panels, failed joints and settled areas can be removed and replaced in phases so the business stays open. We seal joints after repairs to slow water and salt intrusion.
Many lots we repair were built during an earlier growth spurt with thin sections over clay. We replace failing panels at a thickness and base depth that suit today's traffic.
We go over the civil plans, joint layout and phasing with the owner or general contractor, including how customers and deliveries will move during construction.
Right-of-way work is permitted through Metro, and stormwater controls are installed before grading. For sites disturbing an acre or more, coverage under the state construction stormwater permit is in place first.
The subgrade is proof-rolled and stabilized, stone base is placed and compacted, and concrete is poured and finished in planned sections with dowels and tie bars.
Joints are saw-cut and sealed, curing is completed and the lot is cleaned for striping. We walk the finished lot with the owner before opening it to traffic. Any punch-list items, from a chipped edge to a joint that needs resealing, are handled before final payment.
For heavy traffic and long life, concrete usually wins. It does not soften in summer heat, and with an air-entrained mix and proper sealing it handles freeze-thaw cycles well.
We price from plans after a site review. Thickness, base, drainage structures, phasing and right-of-way work all affect cost, so we provide a written bid rather than a per-foot number.
Bids list the base, thickness and joint design so owners can compare proposals on the same terms.
When certain projects alter the public right-of-way, Metro expects curb ramps to be upgraded and part of the cost put toward accessible pedestrian routes. We build ramps and sidewalks to those standards when a project triggers them.
During construction, Metro also expects contractors to keep an accessible alternate route open for pedestrians, which we plan into the phasing.
Yes. We phase the work, keep entrances open and coordinate around delivery times whenever the layout allows.
Yes. See our commercial sidewalks and curbs page for that work.
Cars can often drive on new pavement within about a week, while heavy trucks wait longer. We schedule openings around the mix design and test results.
Barricades stay in place until the concrete has reached the strength the engineer specified for opening.